Much gandydancing on the W&MR
Submitted by rob on Wed, 2009-06-24 10:07.
Serious progress on the roadbed, more than half done. About 70% of the main loop has roadbed.
More cabling to be done, but four lenghts of 10Amp 240v mains extension cord laid between the two future control panels - gives me 12 connections