Wettington and Mahawatu Rwy site preparation

The Wettington and Mahawatu Railway site was already excavated to roughly level, but was pretty much a wasteland.

Work is progressing to build low garden beds using concrete block walls, with brick paved paths (the site has quite a bit of second-hand brick).

Pukerua Bay is an extremely windy place, and close to the sea (180m). A wind-break wall has gone in. This will also provide some security to the site, as well as making it double as a yard for the dog Jack is going to get (though he doesn't know it yet). It better not chew my track!

Post new comment

The content of this field is kept private and will not be shown publicly.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

More information about formatting options

CAPTCHA
This question is for testing whether you are a human visitor and to prevent automated spam submissions.